Uttarkashi tunnel collapse: Drilling to create passage for trapped workers to resume soon, say officials : The Tribune India

Join Whatsapp Channel

Uttarkashi tunnel collapse: Drilling to create passage for trapped workers to resume soon, say officials

The labourers are safe and oxygen, electricity, medicines, food items and water are being constantly supplied to them through pipes, say officials

Uttarkashi tunnel collapse: Drilling to create passage for trapped workers to resume soon, say officials

Rescue and relief operations underway after a portion of a tunnel under construction between Silkyara and Dandalgaon on the Brahmakhal-Yamunotri national highway collapsed, in Uttarkashi district, on Tuesday, November 14, 2023. PTI



PTI

Uttarkashi, November 16

Drilling to create a passage for 40 workers trapped in an under-construction tunnel that collapsed four days back will resume soon with a new heavy machine, which was flown in from Delhi, officials said here.

The 'American auger' machine was airlifted in parts by three IAF transport aircraft on Wednesday to replace the "failed" equipment which was being used earlier to create the passage. These were then brought from the Uttarakhand's Chinyalisaur airport, over 30 kilometres from the Silkyara tunnel on the Char Dham route, and assembled at the site.  

Installation of the heavy equipment is almost complete and drilling will resume soon, the officials said. The process of installing the new machine began at 11 pm on Wednesday.

The labourers are safe, and oxygen, electricity, medicines, food items and water are being constantly supplied to them through pipes, they said.

"Ninety-five per cent of installation work is complete," Navayuga Engineering Company Public Relations Officer G L Nath said. The company is building the tunnel on behalf of the NHIDCL.

Nath said the labourers are being supplied necessary items every half an hour and they are healthy.

The plan is to use the 'American auger' machine to drill through the rubble of the tunnel's collapsed portion and insert 800-mm and 900-mm diameter sections of mild steel pipes -- one after the other. Once this happens, the workers trapped on the other side of the rubble can crawl out to safety.

The first drilling machine turned out to be too slow and technical issues developed, the officials said. Also, falling debris inside the tunnel damaged the equipment and injured two rescue workers on Tuesday.

A portion of the tunnel, part of the ambitious Char Dham all-weather road project, collapsed on Sunday. The 30-metre collapsed section is 270 metres from the mouth of the tunnel from the Silkyara side.

A six-bed makeshift hospital has been set up and 10 ambulances with expert doctors stationed outside the tunnel to provide immediate medical care to the trapped workers after their evacuation.

#United States of America USA


Top News

Want fair probe, justice in Swati Maliwal assault case as incident has two versions: Arvind Kejriwal

Want fair probe, justice in Swati Maliwal assault case as incident has two versions: Arvind Kejriwal

In an interview to PTI, the chief minister says the matter i...

Bomb threat email received by North Block, security officers conduct searches

North Block receives bomb threat email, turns out to be hoax

The threat is received through an email around 3.30 pm by a ...

Pune juvenile court cancels bail of teenager involved in car crash, sends him to observation home

Pune juvenile court cancels bail of teenager involved in car crash, sends him to observation home

The board had on Sunday granted bail to him hours after the ...

Police allocate designated protest site to farmers ahead of PM Modi’s rally in Patiala

Police allocate designated protest site to farmers ahead of PM Modi’s rally in Patiala

Hectic parleys on as Kirti Kisan Union plans to block all ro...


Cities

View All