Delhi Metro begins trial runs on Badarpur-Faridabad line : The Tribune India

Join Whatsapp Channel

Delhi Metro begins trial runs on Badarpur-Faridabad line

NEW DELHI: Delhi Metro on Sunday began its trial runs on the fully elevated 14 km-long Badarpur-Faridabad corridor, setting in motion the process of formally opening the line by June.

Delhi Metro begins trial runs on Badarpur-Faridabad line

Badarpur-Faridabad corridor metro train on its first trial run in Faridabad on Sunday. PTI photo



New Delhi, April 12

Delhi Metro on Sunday began its trial runs on the fully elevated 14 km-long Badarpur-Faridabad corridor, setting in motion the process of formally opening the line by June.

Delhi Metro Railway Corporation had made its foray into Haryana five years ago and with this project, the DMRC will further spread its operations in the neighbouring state.

DMRC MD Mangu Singh was also present during the flagging off of the first trial run.

"The first trial train on this section today (Sunday) travelled from the Badarpur station to Old Faridabad Metro station," a statement said.

A metro spokesman said the interaction of the trains with civil structure would be checked during trial runs to ensure that there is no physical blockage during its movement on the tracks.

"The entire signalling system will also undergo rigorous testing. In addition, train response at different speeds, braking and inter-connection with the Operations Control Centre (OCC) are monitored during the trials," the spokesman said.

The corridor is an extension of the existing Mandi House -Badarpur line (Line 6) of the network. According to official estimates, around 1.92 lakh passengers travel by the line, which is Line 6, on an average every day.

Once fully operational, the line will span from Kashmere Gate to Escorts Mujesar having a length of 43.4 km, with a total of 32 stations, including five interchange stations, namely Kashmere Gate, Mandi House, Central Secretariat, Lajpat Nagar and Kalkaji Mandir.

Apart from the Mujesar terminal station, the upcoming stations are Sarai, NHPC Chowk, Mewala Maharajpur, Sector 28, Badkal Mor, Old Faridabad, Neelam Chowk Ajronda and Bata Chowk.

The depot for the section, which has been named Arjonda Depot, has been constructed near Sector 20 A in the city.

Officials said two more stations, NCB Colony and Ballabgarh, would be added in the line by 2017, thus increasing the length of the line by another 3.2 km.

After trial runs, DMRC will have to get the mandatory Commissioner for Metro Rail Safety (CMRS) clearance, after inspecting the line for all safety parameters for passengers. — PTI

Top News

Nestle adds sugar to baby food sold in India but not in Europe

Nestle adds sugar to baby food sold in India but not in Europe: Study

Such products are sugar-free in the United Kingdom, Germany,...

Telangana school attacked after students questioned 'saffron dress'

Telangana school attacked after students questioned 'saffron dress'

School officials booked by police over 'saffron dress' row

US reacts to Elon Musk's 'backing permanent seat for India’ remark

US reacts to Elon Musk's 'backing permanent seat for India’ remark

Elon Musk had called India not having a permanent seat in th...

Punjab-origin man awaiting deportation because of his illegal entry dies in US hospital

Punjab-origin man awaiting deportation because of his illegal entry to US dies in hospital

On June 29, 2023, Jaspal Singh was arrested by US Customs an...

ED attaches Rs 98 cr worth assets of actor Shilpa Shetty, husband Raj Kundra

ED attaches Rs 98 cr worth assets of actor Shilpa Shetty, husband Raj Kundra

The case pertains to cheating of investor funds through use ...


Cities

View All