DT
PT
Subscribe To Print Edition About The Tribune Code Of Ethics Download App Careers Advertise with us Classifieds
Gen Z Speak Up !
Add Tribune As Your Trusted Source
search-icon-img
search-icon-img
Advertisement

Mumbai Airport T1 set for phased redevelopment; 91% passenger traffic unaffected: Sources

  • fb
  • twitter
  • whatsapp
  • whatsapp
Advertisement

Mumbai (Maharashtra) [India], October 3 (ANI): A major overhaul and modernisation programme for Terminal 1 (T1) at Chhatrapati Shivaji Maharaj International Airport (CSMIA) is officially underway, aviation industry sources revealed.

“Flight operations may be shifted from T1 to the nearest available terminal options,” industry sources said.

Advertisement

Despite the scale of the infrastructure work, airport operations have been structured to ensure that approximately 91% of total passenger traffic remains completely unaffected.

Advertisement

“Around 91% of the passenger traffic will remain unaffected,” industry sources said.

The comprehensive redevelopment plan aims to replace ageing T1 structures with a modernised, high-capacity terminal featuring upgraded airside access, advanced baggage handling systems, and seamless inter-terminal transit links.

Advertisement

Industry sources said the terminal is likely to be only partially closed rather than completely shut, allowing the airport to manage the redevelopment work alongside continued operations.

Further details on the scale of the partial closure, the flights or airlines that could be affected and the timeline for shifting operations have not yet been disclosed. (ANI)

(This content is sourced from a syndicated feed and is published as received. The Tribune assumes no responsibility or liability for its accuracy, completeness, or content.)

Read what others can’t with The Tribune Premium

Advertisement
Advertisement
Advertisement
Advertisement
tlbr_img1 Classifieds tlbr_img2 Videos tlbr_img3 Premium tlbr_img4 E-Paper tlbr_img5 Shorts