DT
PT
Subscribe To Print Edition About The Tribune Code Of Ethics Download App Careers Advertise with us Classifieds
Gen Z Speak Up !
Add Tribune As Your Trusted Source
search-icon-img
search-icon-img
Advertisement

Preparing for monsoon, Chandigarh Administration starts desilting Patiala Ki Rao choe

  • fb
  • twitter
  • whatsapp
  • whatsapp
featured-img featured-img
Overgrown vegetation and wild bushes obstruct the natural flow of Patiala Ki Rao in Chandigarh. File
Advertisement

With an aim to prevent recurring flood-like situations in low-lying areas, the UT Administration on Saturday started de-siltation of Patiala Ki Rao choe.

The project involves removal of approximately 2.81 lakh cubic metres of silt, along with strengthening of the embankment. The work was formally inaugurated by nominated councillor Satinder Pal Singh Sidhu.

Advertisement

Patiala Ki Rao has long been a source of concern for residents living in low-lying areas such as Dhanas, Khuda Lahora and Dadumajra. During the monsoon season, rainwater flowing down from the hills often caused a sudden rise in the water level of the seasonal river, leading to flood-like situations. Last year, the overflowing river caused extensive damage to agricultural land in Dhanas.

Advertisement

Residents of Dhanas and nearby localities had been demanding proper cleaning and desilting of the choe for years. The Administration has now started an extensive clean-up drive covering the entire stretch of Patiala Ki Rao within the UT limits.

Officials said desilting work would be carried out aggressively near key locations, including the bridges at Khuda Jassu and Khuda Lahora, Dhanas, Sector 25, near the dumping ground bridge and further towards Togan. Apart from removing silt, the project will also include clearing the riverbed area and removing wild bushes and overgrown vegetation obstructing the natural flow of water.

Advertisement

Sidhu, who had raised the issue earlier, said the desiltation work was crucial for restoring the water-carrying capacity of the choe. “Accumulation of silt had significantly reduced the water flow, leading to flooding of the choe’s vicinity. This project is essential to safeguard lives, livestock and agricultural land,” he said.

As per official guidelines, the excavated material will primarily be used to reinforce the choe’s embankments. Any surplus material may be used for public purposes, including development at the Dadumajra dumping ground and infrastructure works at Government High School, Sarangpur.

Read what others can’t with The Tribune Premium

Advertisement
Advertisement
Advertisement
Advertisement
tlbr_img1 Classifieds tlbr_img2 Videos tlbr_img3 Premium tlbr_img4 E-Paper tlbr_img5 Shorts