DT
PT
Subscribe To Print Edition About The Tribune Code Of Ethics Download App Careers Advertise with us Classifieds
Gen Z Speak Up !
Add Tribune As Your Trusted Source
search-icon-img
search-icon-img
Advertisement

Broad-gauge dream gains momentum in Himachal Pradesh

Railways launches crucial traffic study on Pathankot-Jogindernagar route

  • fb
  • twitter
  • whatsapp
  • whatsapp
featured-img featured-img
A train on the narrow-gauge track winding through the Kangra valley.
Advertisement

In a major boost to infrastructure in Himachal Pradesh, the Ministry of Railways has taken a definitive step toward converting the strategically vital Pathankot-Jogindernagar narrow-gauge railway line into a broad-gauge corridor. The long-pending modernisation project has entered a crucial phase with the commencement of a comprehensive traffic study along the entire route.

Considered the lifeline of the Kangra valley, this British-era railway network has served the hill districts of Kangra and Mandi for nearly a century. However, the current narrow-gauge system suffers from severe limitations in speed, capacity and overall operational efficiency.

Advertisement

The ongoing traffic study is an integral component of the Final Location Survey (FLS) and the Detailed Project Report (DPR) authorised by the Railway Board. To ensure an exhaustive technical and financial assessment, the Northern Railway has outsourced the task to a private consultancy firm, M/s LN Malviya Infra Projects Private Limited.

Advertisement

Specialised survey teams are currently deployed across the 200-km corridor, which stretches from Pathankot in Punjab to Jogindernagar in Himachal Pradesh. The teams are gathering ground-level data on — population density and local travel patterns; current and future freight demand; tourism potential and industrial activity; and the findings will be used to calculate the Economic Internal Rate of Return (EIRR) and Financial Internal Rate of Return (FIRR), which will ultimately determine the project’s economic viability.

Railway planners emphasise that the upgraded broad-gauge line will seamlessly integrate Himachal Pradesh with the national rail network. Beyond its immense strategic value, the project is expected to transform regional transportation, accelerate freight movement and provide a massive facelift to local tourism.

Advertisement

Local residents, business communities and tourism stakeholders have widely welcomed the development, expressing optimism that the vital corridor is finally moving closer to reality.

Read what others can’t with The Tribune Premium

Advertisement
Advertisement
Advertisement
Advertisement
tlbr_img1 Classifieds tlbr_img2 Videos tlbr_img3 Premium tlbr_img4 E-Paper tlbr_img5 Shorts