Inside the Zojila tunnel
Adil Akhzer reports from the project site as the 13.1-km main tunnel — that will bring all-weather connectivity between Kashmir and Ladakh — nears breakthrough
Every time 49-year-old Hari Chand, a concrete pump operator, takes a small break inside the under-construction Zojila tunnel, he makes a beeline for the heater, soaking in a few precious moments of warmth. Outside, temperatures have plunged to minus 18°C. Yet Chand, a native of Haryana, carries on.







