DT
PT
Subscribe To Print Edition About The Tribune Code Of Ethics Download App Advertise with us Classifieds
search-icon-img
search-icon-img
Advertisement

Govt opts for brick lining to repair canal bed in Faridkot

The Water Resources Department will opt for brick lining to repair the bed of the Sirhind Feeder Canal here. This was stated by the department Superintending Engineer in a letter to the Superintending Engineer, Ferozepur Canal Circle, on January 20....
  • fb
  • twitter
  • whatsapp
  • whatsapp
Advertisement

The Water Resources Department will opt for brick lining to repair the bed of the Sirhind Feeder Canal here.

This was stated by the department Superintending Engineer in a letter to the Superintending Engineer, Ferozepur Canal Circle, on January 20.

The department will also construct a special structure to help recharge the groundwater near three canal outlets from where water is supplied to farmers for irrigation purposes.

Advertisement

Earlier, Faridkot Deputy Commissioner Vineet Kumar announced that the department will complete by February-end the strengthening of the 10-km stretch of the canal structure along the town.

A group of people protesting under the banner of the Jal Jeevan Bachao Morcha had expressed fear that the concrete lining of the canal would lead to a drastic fall in underground water levels, leaving a large number of area residents without access to drinking water.

Advertisement

They feared that the adding of an impermeable layer of concrete to the canal bed and its edges would prevent the seepage of water into the ground.

The DC had sought to dispel the fears, saying instead of undertaking concrete lining, they would stick to the old practice of brick lining.

Advertisement
Advertisement
Advertisement
Advertisement
tlbr_img1 Home tlbr_img2 Opinion tlbr_img3 Classifieds tlbr_img4 Videos tlbr_img5 E-Paper