Take 2: NASA aims for Saturday launch of new moon rocket : The Tribune India

Take 2: NASA aims for Saturday launch of new moon rocket

he 322-foot rocket — the most powerful ever built by NASA — remains on its pad at Kennedy Space Center with an empty crew capsule on top

Take 2: NASA aims for Saturday launch of new moon rocket

In this photo provided by NASA, NASAs Space Launch System rocket with the Orion spacecraft aboard is seen atop the mobile launcher at Launch Pad 39B, on Tuesday, August 30, 2022, at NASAs Kennedy Space Center in Cape Canaveral, Florida, NASAs Artemis I flight test is the first integrated test of the agencys deep space exploration systems. AP/PTI

Cape Canaveral (US), August 31

NASA will try again on Saturday to launch its new moon rocket on a test flight, after engine trouble halted the first countdown this week.

Managers said on Tuesday they are changing fueling procedures to deal with the issue. A bad sensor also could be to blame for Monday’s scrapped launch, they noted.

The 322-foot rocket — the most powerful ever built by NASA — remains on its pad at Kennedy Space Center with an empty crew capsule on top.

The Space Launch System rocket will attempt to send the capsule around the moon and back. No one will be aboard, just three test dummies. If successful, it will be the first capsule to fly to the moon since NASA’s Apollo programme 50 years ago.

Proceeding toward a Saturday launch will provide additional insight, even if the problem reappears and the countdown is halted again, said NASA’s rocket program manager, John Honeycutt. That’s better “than us sitting around scratching our heads, was it good enough or not.”

“Based on what I’ve heard from the technical team today, what we need to do is continue to pore over the data and polish up our plan on putting the flight rationale together,” he said.

During Monday’s launch attempt, readings showed that one of the four main engines in the rocket’s core stage could not be chilled sufficiently prior to the planned ignition at liftoff. It appeared to be as much as 40 degrees Fahrenheit (5 degrees Celsius) warmer than the desired minus-420 degrees Fahrenheit (minus-250 degrees Celsius), the temperature of the hydrogen fuel, according to Honeycutt. The three other engines came up just a little short.

All of the engines appear to be fine, according to Honeycutt.

The chilling operation will be conducted a half-hour earlier for Saturday afternoon’s launch attempt, once fueling begins that morning. Honeycutt said the timing of this engine chilldown was earlier during successful testing last year, and so performing it sooner may do the trick.

Honeycutt also questioned the integrity of one engine sensor, saying it might have provided inaccurate data Monday. To change that sensor, he noted, would mean hauling the rocket back into the hangar, resulting in weeks of delay.

Already years behind schedule, the $4.1 billion test flight is the opening shot in NASA’s Artemis moon-exploration program, named after the twin sister of Apollo in Greek mythology. Astronauts could strap in as soon as 2024 for a lap around the moon and actually attempt a lunar landing in 2025. AP

Tribune Shorts


Top News

Chandigarh University video leak case: Army personnel arrested from Arunachal

Chandigarh University video leak case: Army man, alleged to be main suspect, arrested from Arunachal

A girl student and two men from Himachal have already been a...

Uttarakhand resort murder: Body of young woman found; BJP leader, son expelled as outrage grows

Uttarakhand resort murder: Body of receptionist Ankita found; BJP leader, son expelled as outrage grows

Administration starts demolishing Vanantara resort in Pauri,...

Two non-local labourers shot at in J-K's Pulwama

Two non-local labourers shot at in J-K's Pulwama

Shifted to hospital where their condition is stated to be st...


Cities

View All