Add Tribune As Your Trusted Source
TrendingVideosIndia
Opinions | CommentEditorialsThe MiddleLetters to the EditorReflections
UPSC | Exam ScheduleExam Mentor
State | Himachal PradeshPunjabJammu & KashmirHaryanaChhattisgarhMadhya PradeshRajasthanUttarakhandUttar Pradesh
City | ChandigarhAmritsarJalandharLudhianaDelhiPatialaBathindaShaharnama
World | ChinaUnited StatesPakistan
Diaspora
Features | The Tribune ScienceTime CapsuleSpectrumIn-DepthTravelFood
Business | My MoneyAutoZone
News Columns | Straight DriveCanada CallingLondon LetterKashmir AngleJammu JournalInside the CapitalHimachal CallingHill View
Don't Miss
Advertisement

Gujarat: Railway Minister Vaishnaw and Japan's Minister Nakano inpects bullet train stretch in Surat

Unlock Exclusive Insights with The Tribune Premium

Take your experience further with Premium access. Thought-provoking Opinions, Expert Analysis, In-depth Insights and other Member Only Benefits
Yearly Premium ₹999 ₹349/Year
Yearly Premium $49 $24.99/Year
Advertisement

Surat (Gujarat) [India], October 3 (ANI): Minister of Railways Ashwini Vaishnaw, along with Japan's Minister of Land, Infrastructure, Transport and Tourism Hiromasa Nakano, on Friday inspected the construction of the Surat stretch of the Mumbai-Ahmedabad High-Speed Rail (MAHSR) bullet train project.

Advertisement

The Japanese Minister was accorded a traditional Garba welcome at the Surat airport.

Advertisement

The two Ministers reviewed significant aspects of the project during their visit, including the advanced track slab laying car and the track slab adjustment facility, both key components.

They expressed satisfaction with the quality standards being followed and commended the rapid pace of construction.

Advertisement

The visit reflects strong collaboration between India and Japan in implementing India's first High-Speed Rail corridor.

Surat is set to witness a major boost in growth and connectivity with the upcoming Bullet Train station. The station has been thoughtfully designed with a strong focus on passenger comfort and convenience. Soothing interiors, natural lighting through skylights, and well-ventilated platforms will ensure a calm and pleasant travel experience.

A Multi-Modal Integration plan has been prepared in collaboration with Surat Municipal Corporation (SMC) and Surat Urban Development Authority (SUDA) under the project for Station Area Development along the Mumbai-Ahmedabad High Speed Rail project (SMART). This will allow passengers to easily switch between metro trains, buses, taxis, autos, and other local transport, ensuring smooth traffic flow around the station. Such connectivity will significantly reduce transition time, making travel faster, safer, and more convenient for everyone.

India's first 508 km long Bullet Train corridor is being constructed between Mumbai and Ahmedabad. Out of 508 km, 323 km of viaduct and 399 km of pier work have been completed, including 17 River bridges, five PSC (pre-stressed concrete) and nine Steel bridges. (ANI)

(This content is sourced from a syndicated feed and is published as received. The Tribune assumes no responsibility or liability for its accuracy, completeness, or content.)

Advertisement
Tags :
Ashwini VaishnawGujarathigh-speed railHiromasa nakanoHsrSurat
Show comments
Advertisement