TrendingVideosIndia
Opinions | CommentEditorialsThe MiddleLetters to the EditorReflections
Sports
State | Himachal PradeshPunjabJammu & KashmirHaryanaChhattisgarhMadhya PradeshRajasthanUttarakhandUttar Pradesh
City | ChandigarhAmritsarJalandharLudhianaDelhiPatialaBathindaShaharnama
World | United StatesPakistan
Diaspora
Features | The Tribune ScienceTime CapsuleSpectrumIn-DepthTravelFood
Business | My MoneyAutoZone
UPSC | Exam ScheduleExam Mentor
Don't Miss
Advertisement

Chandigarh Administration mulls shorter route to airport from Sector 48

Unlock Exclusive Insights with The Tribune Premium

Take your experience further with Premium access. Thought-provoking Opinions, Expert Analysis, In-depth Insights and other Member Only Benefits
Yearly Premium ₹999 ₹349/Year
Yearly Premium $49 $24.99/Year
Advertisement

Dushyant Singh Pundir

Advertisement

Advertisement

Chandigarh, March 8

In order to cut travel time, the UT Administration is considering providing a shorter road to the airport from the Sector 48 side. It would save commuters’ time by more than 20 minutes as the total distance would be reduced from 14.5 km to 3.5 km.

The new route would start from Junction 63 in Sector 48 and after passing through the villages of Faidan and Jagatpura, it would connect to the airport road along the boundary of the airport.

Advertisement

According sources, the UT Administration would hold talks with the Punjab Government for the acquisition of land that falls in Jagatpura village for the construction of a wide road.

UT Adviser Dharam Pal had in December last year directed the Deputy Commissioner (DC) and the UT Chief Engineer to prepare a report on alternative shorter routes to the international airport from Chandigarh.

To reduce the road distance, the Ministry of Home Affairs (MHA) had recently decided to conduct a feasibility study on the connectivity to the airport from the Purv Marg side near Sector 48. The road will run through the Jagatpura area.

In its earlier recommendations, the committee had stated that it was aware that a short approach road towards the airport was functional in the past. “But now, around 30 km extra need to be covered as the entry has been shifted to the other side and reaching it is time consuming,” said the panel. In response to the recommendations of the committee, the MHA submitted that three alternative approaches were suggested in the Chandigarh Master Plan, 2031. These alternatives were discussed at various meetings which failed to reach a conclusion.

Advertisement
Show comments
Advertisement