TrendingVideosIndia
Opinions | CommentEditorialsThe MiddleLetters to the EditorReflections
UPSC | Exam ScheduleExam Mentor
State | Himachal PradeshPunjabJammu & KashmirHaryanaChhattisgarhMadhya PradeshRajasthanUttarakhandUttar Pradesh
City | ChandigarhAmritsarJalandharLudhianaDelhiPatialaBathindaShaharnama
World | ChinaUnited StatesPakistan
Diaspora
Features | The Tribune ScienceTime CapsuleSpectrumIn-DepthTravelFood
Business | My MoneyAutoZone
News Columns | Straight DriveCanada CallingLondon LetterKashmir AngleJammu JournalInside the CapitalHimachal CallingHill View
Don't Miss
Advertisement

Drain work poses threat to commuters in Dera Bassi

Unlock Exclusive Insights with The Tribune Premium

Take your experience further with Premium access. Thought-provoking Opinions, Expert Analysis, In-depth Insights and other Member Only Benefits
Yearly Premium ₹999 ₹349/Year
Yearly Premium $49 $24.99/Year
Advertisement
Advertisement

Zirakpur, September 24

Advertisement

Iron rods jutting out from an under-construction drain alongside the Ambala-Chandigarh national highway are posing a serious threat to road users from the Bhankharpur light points to Ghaggar bridge stretch. It has been more than six months that the storm water drain is under-construction but there is no sign of its completion anytime soon.

The unending construction work has narrowed down the road at this stretch for around 300 m, creating a major bottleneck. During traffic jams here, queues of vehicles at times extend up to the Zirakpur flyover resulting in a chaos in Zirakpur town.

The National Highway Authority of India (NHAI) has been moving at a snail’s pace in the construction of the two vehicular underpasses (VUP) and upkeep of service lanes in the vicinity. “Does it take more than six months to complete a drain?” asked a Zirakpur resident.

Advertisement

Besides causing traffic jams, the narrow stretch has become highly accident-prone due to iron rods jutting out alongside the main highway.

On Thursday night, a bike-borne newlywed couple received serious injuries after they fell on the iron rods alongside the road. After the accident, Yash Taneja and his wife were taken to a Dera Bassi hospital in an ambulance. The couple complained that poor lighting in the area was one of the reasons for the accident.

Advertisement
Tags :
AmbalaDeraBassiZirakpur
Show comments
Advertisement