TrendingVideosIndia
Opinions | CommentEditorialsThe MiddleLetters to the EditorReflections
Sports
State | Himachal PradeshPunjabJammu & KashmirHaryanaChhattisgarhMadhya PradeshRajasthanUttarakhandUttar Pradesh
City | ChandigarhAmritsarJalandharLudhianaDelhiPatialaBathindaShaharnama
World | United StatesPakistan
Diaspora
Features | The Tribune ScienceTime CapsuleSpectrumIn-DepthTravelFood
Business | My MoneyAutoZone
UPSC | Exam ScheduleExam Mentor
Don't Miss
Advertisement

Civic body launches anti-encroachment drive in Panipat

500 slabs, structures on Panipat-Sanoli-Haridwar highway removed
A JCB machine deployed by the Municipal Corporation removes encroachments on the Panipat-Sanoli-Haridwar highway on Thursday.

Unlock Exclusive Insights with The Tribune Premium

Take your experience further with Premium access. Thought-provoking Opinions, Expert Analysis, In-depth Insights and other Member Only Benefits
Yearly Premium ₹999 ₹349/Year
Yearly Premium $49 $24.99/Year
Advertisement

The Municipal Corporation (MC) has launched a special anti-encroachment drive on the Panipat-Haridwar National Highway heading from Sanjay Chowk to Babbail Naka. The MC teams removed around 500 slabs constructed in front of shops and showrooms during the three-day drive.

Advertisement

The MC could not clean a drain for over a year as shopkeepers and showroom owners had made concrete structures on it. Notably, water gets accumulated on the NH-44 and the Panipat-Sanoli road during the rainy season every year because of which people face a lot of problems.

Advertisement

To resolve the waterlogging issue, the MC constructed a wide stormwater drain on both sides of the Sanoli road and covered it with concrete slabs around four years ago.

A former councillor said heading from NH-44, the stormwater drain on the right side up to Babbail Naka was constructed in a single phase, while on the left side, the drain was constructed in three phases.

The MC wanted to clean drain before the onset of the monsoon, but it was covered with concrete structures by showroom owners. To sort out the issue, the MC launched a special drive and started removing encroachments and structures constructed by showroom owners and shopkeepers.

Advertisement

Gopal Kalawat, XEN said, “Showroom owners have covered the storm water drain with concrete structures. There is no space left for cleaning it.” He said, “Monsoon is yet to arrive. If drain is not cleaned on time, the road will get waterlogged. These slabs and structures are the major hindrance in cleaning of the drain.” He said, “Around 500 slabs have been removed during the drive which will continue from the road heading from the NH-44 to Babbail Naka. The road will also be widened and decorative lights installed here for its beautification.”

He said, “Seventy-six decorative lights will be installed here for which foundations have been constructed. Apart from it, footpaths will also be constructed on both sides of the road after widening it.”

Advertisement
Tags :
#RoadWideningantiencroachmentdriveBeautificationProjectdraincleaningmunicipalcorporationNH44PanipatHaridwarHighwayShopEncroachmentStormwaterDrainWaterloggingSolution
Show comments
Advertisement