TrendingVideosIndia
Opinions | CommentEditorialsThe MiddleLetters to the EditorReflections
Sports
State | Himachal PradeshPunjabJammu & KashmirHaryanaChhattisgarhMadhya PradeshRajasthanUttarakhandUttar Pradesh
City | ChandigarhAmritsarJalandharLudhianaDelhiPatialaBathindaShaharnama
World | United StatesPakistan
Diaspora
Features | The Tribune ScienceTime CapsuleSpectrumIn-DepthTravelFood
Business | My MoneyAutoZone
UPSC | Exam ScheduleExam Mentor
Don't Miss
Advertisement

Kurukshetra road overbridge built in 120 hours

Unlock Exclusive Insights with The Tribune Premium

Take your experience further with Premium access. Thought-provoking Opinions, Expert Analysis, In-depth Insights and other Member Only Benefits
Yearly Premium ₹999 ₹349/Year
Yearly Premium $49 $24.99/Year
Advertisement

Shiv Kumar Sharma

Advertisement

Tribune News Service

Advertisement

Yamunanagar, June 15

A newly builty road overbridge on the Yamunanagar-Kurukshetra road near Chandpur colony here was on Tuesday thrown open to the vehicular movement.

Dedicated Freight Corridor Corporation of India Limited (DFCCIL), which was entrusted with the construction work, said the road overbridge had been built in a record minimum time of 120 hours.

Advertisement

This stretch of the road, which is considered a lifeline of the city, was closed on Thursday evening for the construction work.

The district administration had diverted traffic to other routes, but commuters faced a difficult time due to long jams on alternate routes.

“I am a daily commuter and use this stretch on the Yamunanagar-Kurukshetra road to go to my office in Industrial Area. However, due to the closure of the road, I witnessed long traffic jams on alternate routes,” said Rahul Kumar, a resident of Radaur town.

Pankaj Gupta, chief general manager, DFCCIL, Ambala, said,“It was a challenging task to build a road overbridge on the dedicated freight corridor railway line here in a minimum possible time.”

He said DFCCIL, Ambala unit, in close coordination with contractor M/S Tata Projects Limited, planned the construction using an innovative technique.

“Limited site space and proximity to the Railway electricity lines carrying live 25 KV current made the task look more difficult and challenging,” said Gupta.

He said, “Meticulously planning, close coordination with the operators of cranes, hydra cranes, JCB machines and multi-tasking work force enabled us to complete a mammoth task in a short period, with success and safety.” 

Advertisement
Show comments
Advertisement