TrendingVideosIndia
Opinions | CommentEditorialsThe MiddleLetters to the EditorReflections
Sports
State | Himachal PradeshPunjabJammu & KashmirHaryanaChhattisgarhMadhya PradeshRajasthanUttarakhandUttar Pradesh
City | ChandigarhAmritsarJalandharLudhianaDelhiPatialaBathindaShaharnama
World | United StatesPakistan
Diaspora
Features | The Tribune ScienceTime CapsuleSpectrumIn-DepthTravelFood
Business | My MoneyAutoZone
UPSC | Exam ScheduleExam Mentor
Don't Miss
Advertisement

Repair of master service roads in Gurugram soon

Unlock Exclusive Insights with The Tribune Premium

Take your experience further with Premium access. Thought-provoking Opinions, Expert Analysis, In-depth Insights and other Member Only Benefits
Yearly Premium ₹999 ₹349/Year
Yearly Premium $49 $24.99/Year
Advertisement
Advertisement

The Gurugram Metropolitan Development Authority (GMDA) will soon start repairing the master dividing and service roads of various sectors in Gurugram. GMDA has allotted five works pertaining to the repair work to agencies. The tenders of these works were approved earlier this month in the high-powered purchase committee meeting chaired by Haryana Chief Minister Nayab Singh Saini in Chandigarh.“Over 64 km of master sector roads across the city along with 17.2 km of service roads will be repaired to improve the road infrastructure in Gurugram. The works have been allotted to the agencies and will be soon be underway,” said Arun Dhankar, Chief Engineer, Infra 1 division.Several roads in the city have been covered in the scope of work for the benefit of the public at large who traverse along these stretches. These include special repair of master roads dividing sector 23/23A, sector 18/19, Mahavir Chowk to Atul Kataria, sector 15 part 1 and 2, New Railway Road, Old Railway Road, Civil Lines Road, sector 9/9A, Krishna Chowk to Rezangla Chowk, sector 5/6, sector 22/23, sector 7/8, and sector 21/22.

Advertisement

Almost 28 km of road length will undergo repair at a cost of Rs 24.70 crore. It will also include repair of master roads dividing sectors 30/31, 33/34, 57 part I and II, 49/50, 69/70, 70/75, 70/70A, 25/28 and 24/26. In this work, approximately 19 km of master sector roads will be repaired at a cost of Rs 21.90 crore. As per the plan, repair will also be launched for repair of master roads dividing sectors 81/81A to 86/87, 90/91, 82/85 to 83/84, 87 open space to 81/86. Approximately 8.1 km road length will be repaired at a cost of Rs 20.74 crore and master road dividing sectors 90/93, 92/95, 91/92, 92/95 open space and outer 91 open space. Approximately 9.45 km of road length will be improved at a cost of Rs 24.99 crore. According to the authority, in addition to the repair and upgradation of master sector roads, GMDA is also taking up the strengthening and repair of service roads along the master roads from sector 58 to 67, Gurugram. In this work, over 17.2 km length of surface roads along these sectors will be repaired at a cost of Rs 24.72 crore.

Advertisement
Show comments
Advertisement