TrendingVideosIndia
Opinions | CommentEditorialsThe MiddleLetters to the EditorReflections
UPSC | Exam ScheduleExam Mentor
State | Himachal PradeshPunjabJammu & KashmirHaryanaChhattisgarhMadhya PradeshRajasthanUttarakhandUttar Pradesh
City | ChandigarhAmritsarJalandharLudhianaDelhiPatialaBathindaShaharnama
World | ChinaUnited StatesPakistan
Diaspora
Features | The Tribune ScienceTime CapsuleSpectrumIn-DepthTravelFood
Business | My MoneyAutoZone
News Columns | Straight DriveCanada CallingLondon LetterKashmir AngleJammu JournalInside the CapitalHimachal CallingHill View
Don't Miss
Advertisement

Chief Engr orders long-term fix for Nurpur’s water woes

He also visited the gravity pipeline linked to the town’s overhead storage tank
Chief Engineer of the Jal Shakti Department Deepak Garg (centre) inspects landslide-prone zone in the Nurpur area.

Unlock Exclusive Insights with The Tribune Premium

Take your experience further with Premium access. Thought-provoking Opinions, Expert Analysis, In-depth Insights and other Member Only Benefits
Yearly Premium ₹999 ₹349/Year
Yearly Premium $49 $24.99/Year
Advertisement

Taking cognisance of media reports on repeated piped water disruptions in Nurpur, Chief Engineer of the Jal Shakti Department (JSD), Dharamsala, Deepak Garg, rushed to the town yesterday where residents had been struggling without regular supply for nearly two weeks. Accompanied by the local Superintending Engineer and Executive Engineer, Garg inspected the landslide-hit terrain where the rising pipelines of the Chakki water supply scheme have been repeatedly damaged.

Advertisement

He also visited the gravity pipeline linked to the town’s overhead storage tank, which temporarily caters to residents through gravity-fed supply. Garg revealed that nearly 65 per cent of the main rising pipeline runs through landslide-prone stretches of Kopra gram panchayat, making it vulnerable during the monsoon.

Advertisement

After surveying the site with senior officials and field staff, the Chief Engineer directed the Nurpur XEN to prepare a long-term safety plan for the pipeline network. “The proposal must ensure that such prolonged supply failures are not repeated next monsoon,” he said.

To stabilise the situation, Garg instructed officials to streamline regular water supply in the urban area on priority. Once the monsoon recedes, the department will identify the most severely affected points and begin re-aligning and strengthening pipelines. He assured residents that the JSD would allocate adequate funds and materials for this task.

The intervention has raised hopes among Nurpur residents, who have faced acute hardships due to prolonged water shortages.

Advertisement

Advertisement
Tags :
#ChakkiWaterScheme#InfrastructureRepair#JalShaktiDepartment#LandslideProneArea#NurpurWaterCrisis#PipelineDamageMonsoonImpactWaterManagementWaterShortageWaterSupplyDisruption
Show comments
Advertisement