Add Tribune As Your Trusted Source
TrendingVideosIndia
Opinions | CommentEditorialsThe MiddleLetters to the EditorReflections
UPSC | Exam ScheduleExam Mentor
State | Himachal PradeshPunjabJammu & KashmirHaryanaChhattisgarhMadhya PradeshRajasthanUttarakhandUttar Pradesh
City | ChandigarhAmritsarJalandharLudhianaDelhiPatialaBathindaShaharnama
World | ChinaUnited StatesPakistan
Diaspora
Features | The Tribune ScienceTime CapsuleSpectrumIn-DepthTravelFood
Business | My MoneyAutoZone
News Columns | Straight DriveCanada CallingLondon LetterKashmir AngleJammu JournalInside the CapitalHimachal CallingHill View
Don't Miss
Advertisement

Dagshai road caves in, was sinking since work to widen National Highway-5 started

Unlock Exclusive Insights with The Tribune Premium

Take your experience further with Premium access. Thought-provoking Opinions, Expert Analysis, In-depth Insights and other Member Only Benefits
Yearly Premium ₹999 ₹349/Year
Yearly Premium $49 $24.99/Year
Advertisement

Solan, July 26

Advertisement

A key road leading to the Dagshai Cantonment from Dosarka on the National Highway (NH)-5 has caved in at several places after heavy rain. As a result, travelling on the road has become risky.

Advertisement

School buses, Army trucks and heavy vehicles, besides local residents use the road to travel to Dharampur, Kasauli and Chandigarh.

“A major part of the road caved in after the recent spell of torrential rain. Its condition is deteriorating with every spell of rain,” said Jaspal Singh, a Dagshai resident.

The road began sinking ever since the work to widen the Dharampur-Kumarhatti section of the National Highway-5 was started. Though the protection work have been undertaken on the exposed slopes by raising reinforced concrete walls, they have started wearing out.

Advertisement

Advertisement
Tags :
Solan
Show comments
Advertisement