TrendingVideosIndia
Opinions | CommentEditorialsThe MiddleLetters to the EditorReflections
UPSC | Exam ScheduleExam Mentor
State | Himachal PradeshPunjabJammu & KashmirHaryanaChhattisgarhMadhya PradeshRajasthanUttarakhandUttar Pradesh
City | ChandigarhAmritsarJalandharLudhianaDelhiPatialaBathindaShaharnama
World | ChinaUnited StatesPakistan
Diaspora
Features | The Tribune ScienceTime CapsuleSpectrumIn-DepthTravelFood
Business | My MoneyAutoZone
News Columns | Straight DriveCanada CallingLondon LetterKashmir AngleJammu JournalInside the CapitalHimachal CallingHill View
Don't Miss
Advertisement

Eroded by time, broken by pressure!

On the brink: Another major collapse on the Khara Danda road sparks fear of total shutdown
Uprooted trees in the Narogi area situated beneath Bijli Mahadev hill. Kamal Jeet

Unlock Exclusive Insights with The Tribune Premium

Take your experience further with Premium access. Thought-provoking Opinions, Expert Analysis, In-depth Insights and other Member Only Benefits
Yearly Premium ₹999 ₹349/Year
Yearly Premium $49 $24.99/Year
Advertisement

A vital stretch of Khara Danda Road, once known as Norowjee or Camel Road, has dramatically caved in near ‘Karmu More’, throwing one of Dharamsala’s busiest lifelines into crisis. The road is more than a route. It is the main link binding Dharamsala to McLeodganj, supporting thousands of daily commuters, tourists and local businesses.

Advertisement

For weeks, the warning signs had been visible: widening cracks, sinking patches and uneven surfaces. Now, a sudden collapse has confirmed experts’ fears that the problem runs far deeper than a patchwork fix. Geologists LN Aggarwal and Sanjay Kumbhkarni attribute the disaster to relentless digging for sewage and cables, combined with the punishing load of heavy vehicles. “The slope is precarious, the drainage disrupted and every monsoon accelerates the damage,” they caution.

Advertisement

Environmentalists argue the terrain cannot sustain business as usual. They are urging authorities to bar regular traffic on the stretch, replacing it with light, battery-operated vehicles to reduce strain on the fragile hillside. Their warnings carry weight: just last month, another section near Jogiwara collapsed and with a massive landslide now reported at Forsythganj, durable access to Mcleodganj is almost gone.

Unless immediate, science-backed interventions are made, Khara Danda road risks more than damage. It risks erasure from the map of Himachal’s hill roads.

Advertisement
Advertisement
Show comments
Advertisement