TrendingVideosIndia
Opinions | CommentEditorialsThe MiddleLetters to the EditorReflections
Sports
State | Himachal PradeshPunjabJammu & KashmirHaryanaChhattisgarhMadhya PradeshRajasthanUttarakhandUttar Pradesh
City | ChandigarhAmritsarJalandharLudhianaDelhiPatialaBathindaShaharnama
World | United StatesPakistan
Diaspora
Features | The Tribune ScienceTime CapsuleSpectrumIn-DepthTravelFood
Business | My MoneyAutoZone
News Columns | Kashmir AngleJammu JournalInside the CapitalHimachal CallingHill View
Don't Miss
Advertisement

SJVN to set up 500-MW solar power project

Unlock Exclusive Insights with The Tribune Premium

Take your experience further with Premium access. Thought-provoking Opinions, Expert Analysis, In-depth Insights and other Member Only Benefits
Yearly Premium ₹999 ₹349/Year
Yearly Premium $49 $24.99/Year
Advertisement

Shimla, March 14

Advertisement

SJVN Green Energy Limited (SGEL), the renewable arm of SJVN, has received a Letter of Intent (LOI) from Gujarat Urja Vikas Nigam Limited (GUVNL) for a 500-MW solar project at GUVNL Phase-XXI.

Advertisement

SJVN chairperson Geeta Kapoor said SJVN Green Energy Limited had won the 500-MW (100-MW 400-MW Green Shoe) project at a tariff of Rs 2.54 per unit on ‘Build Own and Operate’ (BOO) basis through tariff-based competitive bidding.

She said the estimated cost of the construction and development of this project was Rs 2,700 crore and it was to be developed at GIPCL Solar Park in Khavda. The Power Purchase Agreement (PPA) with GUVNL would be executed after adoption of the tariff by GERC.

“The project will be commissioned for a period of 18 months from the date of signing of PPA, that is November 2025,” added Kapoor.

Advertisement

Advertisement
Tags :
GujaratShimlasolarenergy
Show comments
Advertisement