Add Tribune As Your Trusted Source
TrendingVideosIndia
Opinions | CommentEditorialsThe MiddleLetters to the EditorReflections
UPSC | Exam ScheduleExam Mentor
State | Himachal PradeshPunjabJammu & KashmirHaryanaChhattisgarhMadhya PradeshRajasthanUttarakhandUttar Pradesh
City | ChandigarhAmritsarJalandharLudhianaDelhiPatialaBathindaShaharnama
World | ChinaUnited StatesPakistan
Diaspora
Features | The Tribune ScienceTime CapsuleSpectrumIn-DepthTravelFood
Business | My Money
News Columns | Straight DriveCanada CallingLondon LetterKashmir AngleJammu JournalInside the CapitalHimachal CallingHill ViewBenchmark
Don't Miss
Advertisement

Bullet train experiences being logged for future projects: PM

Upon completion, the bullet train will reduce travel time between Mumbai and Ahmedabad to nearly two hours.
PM Narendra Modi during a visit to an under-construction bullet train station in Surat. PTI

Unlock Exclusive Insights with The Tribune Premium

Take your experience further with Premium access. Thought-provoking Opinions, Expert Analysis, In-depth Insights and other Member Only Benefits
Yearly Premium ₹999 ₹349/Year
Yearly Premium $49 $24.99/Year
Advertisement

Prime Minister Narendra Modi on Sunday visited the under-construction bullet train station at Surat in Gujarat and reviewed the progress of the Mumbai–Ahmedabad high-speed rail corridor.

Advertisement

He also interacted with the team of India’s first bullet train project and enquired about the progress of the project, including adherence to speed and timetable targets. Workers assured him that the project was advancing smoothly without any difficulties.

Advertisement

They told the PM about the rigorous design and engineering control processes. Modi said as the experiences gained in the bullet train project were being recorded and compiled like a reference book, the country could move decisively towards large-scale implementation of bullet trains. Maintaining such records could benefit future students and contribute to nation-building, he added.

The Mumbai–Ahmedabad High-Speed Rail Corridor spans approximately 508 km, covering 352 km in Gujarat and Dadra & Nagar Haveli and 156 km in Maharashtra.

It will connect major cities, including Sabarmati, Ahmedabad, Anand, Vadodara, Bharuch, Surat, Bilimora, Vapi, Boisar, Virar, Thane and Mumbai, marking a transformative step in India’s transportation infrastructure.

Advertisement

Built with advanced engineering techniques on a par with international standards, the project features 465 km (about 85 per cent of the route) on viaducts, ensuring minimal land disturbance and enhanced safety. So far, 326 km of viaduct work has been completed, and 17 of the 25 river bridges have been constructed.

Upon completion, the bullet train will reduce travel time between Mumbai and Ahmedabad to nearly two hours. The project is expected to boost business, tourism and economic activity along the entire corridor, catalysing regional development.

Advertisement
Tags :
#HighSpeedRail#IndiaRailways#MumbaiAhmedabadBulletTrainBulletTrainGujaratInfrastructureDevelopmentNarendraModiRailProjectSurattransportation
Show comments
Advertisement