TrendingVideosIndia
Opinions | CommentEditorialsThe MiddleLetters to the EditorReflections
UPSC | Exam ScheduleExam Mentor
State | Himachal PradeshPunjabJammu & KashmirHaryanaChhattisgarhMadhya PradeshRajasthanUttarakhandUttar Pradesh
City | ChandigarhAmritsarJalandharLudhianaDelhiPatialaBathindaShaharnama
World | ChinaUnited StatesPakistan
Diaspora
Features | The Tribune ScienceTime CapsuleSpectrumIn-DepthTravelFood
Business | My MoneyAutoZone
News Columns | Straight DriveCanada CallingLondon LetterKashmir AngleJammu JournalInside the CapitalHimachal CallingHill View
Don't Miss
Advertisement

Gadkari launches work on Zojila tunnel with ceremonial blasting

Unlock Exclusive Insights with The Tribune Premium

Take your experience further with Premium access. Thought-provoking Opinions, Expert Analysis, In-depth Insights and other Member Only Benefits
Yearly Premium ₹999 ₹349/Year
Yearly Premium $49 $24.99/Year
Advertisement

New Delhi, October 15

Advertisement

Union Minister Nitin Gadkari on Thursday launched the construction work of the Zojila tunnel and exuded confidence that the strategic project, which would provide all-year connectivity between the Kashmir valley and Leh, will be completed ahead of schedule.

Advertisement

“It is a moment of pride for India. I am confident that it will be completed in four years and the Prime Minister will inaugurate it before the code of conduct for the next Lok Sabha elections,” the Road Transport, Highways and MSMEs Minister said.

The project has a completion schedule of six years.

Gadkari was addressing an event after the virtual launch of the construction work of the 14.15-km Zojila tunnel project through the ceremonial first blast.

Advertisement

He said the remodelling of the project had resulted in the saving of over Rs 4,000 crore to the public exchequer without any compromise on safety, security and quality.

The minister emphasised that with honest efforts, “we can take our country forward at lower costs. The watershed moment in the road history of the UTs of Jammu & Kashmir and Ladakh is finally here… One of the most difficult stretches to drive and build, the geo-sensitive Zojila stretch is strategically important to the defence of our country.”

“The Zojila tunnel will not only provide all-weather connectivity between Srinagar, Drass, Kargil and Leh but it will also further strengthen the economic and social-cultural integration of both the union territories,” Gadkari said.

This tunnel when completed would be a landmark achievement in the history of modern India, the minister said.

He assured formation of committees under the L-G, Leh, and L-G, J&K, with respective Chief Secretaries and officers of the Ministry of Road Transport and Highways, National Highways and Infrastructure Development Corporation Limited (NHIDCL) to oversee tunnel work and to sort out local issues.

The Zojila tunnel project was re-awarded this year to Megha Engineering & Infrastructure Ltd (MEIL), which had emerged as the lowest bidder quoting Rs 4,509.5 crore. The other two bidders in the race were Larsen & Toubro and Ircon International JV. — PTI

Advertisement
Show comments
Advertisement