Add Tribune As Your Trusted Source
TrendingVideosIndia
Opinions | CommentEditorialsThe MiddleLetters to the EditorReflections
UPSC | Exam ScheduleExam Mentor
State | Himachal PradeshPunjabJammu & KashmirHaryanaChhattisgarhMadhya PradeshRajasthanUttarakhandUttar Pradesh
City | ChandigarhAmritsarJalandharLudhianaDelhiPatialaBathindaShaharnama
World | ChinaUnited StatesPakistan
Diaspora
Features | The Tribune ScienceTime CapsuleSpectrumIn-DepthTravelFood
Business | My Money
News Columns | Straight DriveCanada CallingLondon LetterKashmir AngleJammu JournalInside the CapitalHimachal CallingHill ViewBenchmark
Don't Miss
Advertisement

Locals rejoice at road link from Rajouri to Manjakote near LoC

A snow-covered road in Rajouri. File

Unlock Exclusive Insights with The Tribune Premium

Take your experience further with Premium access. Thought-provoking Opinions, Expert Analysis, In-depth Insights and other Member Only Benefits
Yearly Premium ₹999 ₹349/Year
Yearly Premium $49 $24.99/Year
Advertisement

Block Manjakote in Rajouri is getting improved infrastructure through road connectivity and bridge construction for the first time since Independence.

Advertisement

Multiple government schemes have accelerated development in the area near the LoC, providing relief to locals and making it easier to commute.

Advertisement

The Highway 144A Upgradation project, which aims to reduce the travelling time between Rajouri and Poonch by introducing four lanes, has made several border villages easier to reach.

The Manjakote to Rajouri stretch is 3km long and was recently completed, which helps villagers who live in a constant state of alert due to the volatile border.

As Package-6 in the project covers the Kalkar to Dhari Dhara area near Manjakote under the BRO Border Area Connectivity, schemes such as PMGSY (Pradhan Mantri Gram Sadak Yojana), along with PWD and NABARD, are aiding the rapid development of these roads and bridges near remote villages.

Advertisement

Many locals have expressed delight with the road connectivity and the government’s prompt completion of the project, which began in 2023, according to site incharge Sadaam Hussain. He added the project’s allocated amount was Rs 3.02 crore and stated that quality is maintained through daily close monitoring.

Another local, Lambardar Mohd Javed, shared his thoughts on the benefits of the road connectivity, saying, “The state of the area was awful earlier as the children weren’t able to go to schools in the rain. Now, they are getting picked up at the door-front. The project was slightly delayed because of Operation Sindoor and other reasons. Still, the road was quickly completed and allows students to travel and businesses to open up, resulting in the development of the whole area.”

Furthermore, other residents have stated that this road would be pivotal in case someone is injured or needs medical help, which would have turned into a dire situation beforehand.

Just a few days ago, on December 8, BRO also inaugurated the Bhawani Sethu Bridge in Rajouri, which would reduce travel time for three local panchayats — Bhawani, Kslsian, and Jhangher, which also adds to the credibility of the government initiatives to connect remote villages.

Advertisement
Tags :
#ManjakoteRajouri
Show comments
Advertisement