TrendingVideosIndia
Opinions | CommentEditorialsThe MiddleLetters to the EditorReflections
UPSC | Exam ScheduleExam Mentor
State | Himachal PradeshPunjabJammu & KashmirHaryanaChhattisgarhMadhya PradeshRajasthanUttarakhandUttar Pradesh
City | ChandigarhAmritsarJalandharLudhianaDelhiPatialaBathindaShaharnama
World | ChinaUnited StatesPakistan
Diaspora
Features | The Tribune ScienceTime CapsuleSpectrumIn-DepthTravelFood
Business | My MoneyAutoZone
News Columns | Straight DriveCanada CallingLondon LetterKashmir AngleJammu JournalInside the CapitalHimachal CallingHill View
Don't Miss
Advertisement

Cable bridge over Rajasthan's Chambal ready

Unlock Exclusive Insights with The Tribune Premium

Take your experience further with Premium access. Thought-provoking Opinions, Expert Analysis, In-depth Insights and other Member Only Benefits
Yearly Premium ₹999 ₹349/Year
Yearly Premium $49 $24.99/Year
Advertisement

New Delhi, June 14

Advertisement

Construction of a cable-stayed bridge across Chambal river on the Kota bypass on the NH-76 of East-West corridor in Rajasthan has been completed.

Advertisement

In a series of tweets, Union Minister of Road Transport and Highways Nitin Gadkari said the 1.4-km-long cable stayed bridge across Chambal had been built with a total CAPEX of Rs 214 crore and inaugurated in 2017 by the Prime Minister. Gadkari said the bridge was part of the Kota bypass and East-West corridor from Porbandar (Gujarat) to Silchar (Assam). The cables of the bridge are aerodynamic in nature and have the ability to be neutral during storms.

Advertisement
Show comments
Advertisement