TrendingVideosIndia
Opinions | CommentEditorialsThe MiddleLetters to the EditorReflections
UPSC | Exam ScheduleExam Mentor
State | Himachal PradeshPunjabJammu & KashmirHaryanaChhattisgarhMadhya PradeshRajasthanUttarakhandUttar Pradesh
City | ChandigarhAmritsarJalandharLudhianaDelhiPatialaBathindaShaharnama
World | ChinaUnited StatesPakistan
Diaspora
Features | The Tribune ScienceTime CapsuleSpectrumIn-DepthTravelFood
Business | My MoneyAutoZone
News Columns | Straight DriveCanada CallingLondon LetterKashmir AngleJammu JournalInside the CapitalHimachal CallingHill View
Don't Miss
Advertisement

ISRO successfully conducts key rocket engine test for Chandrayaan-3

Unlock Exclusive Insights with The Tribune Premium

Take your experience further with Premium access. Thought-provoking Opinions, Expert Analysis, In-depth Insights and other Member Only Benefits
Yearly Premium ₹999 ₹349/Year
Yearly Premium $49 $24.99/Year
Advertisement

Bengaluru, February 28

Advertisement

The flight acceptance hot test of the CE-20 cryogenic engine that will power the cryogenic upper stage of the launch vehicle for the Chandrayaan-3 mission was successfully conducted, according to the Indian Space Research Organisation.

Advertisement

The hot test was carried out for a planned duration of 25 seconds at the High Altitude Test Facility of the ISRO Propulsion Complex at Mahendragiri in Tamil Nadu on February 24, the Bengaluru-headquartered national space agency said.

“All the propulsion parameters during the test were found satisfactory and closely matched with predictions,” an ISRO statement said on Monday.

The cryogenic engine would be further integrated with the propellant tanks, stage structures and associated fluid lines to realise the fully-integrated flight cryogenic stage, ISRO said.

Advertisement

Earlier this year, Chandrayaan-3 lander successfully underwent EMI/EMC test at UR Rao Satellite Centre here.

EMI-EMC (Electro-Magnetic Interference/ Electro-Magnetic Compatibility) test is conducted for satellite missions to ensure the functionality of the satellite subsystems in the space environment and their compatibility with the expected electromagnetic levels, it was noted.

“This test is a major milestone in the realisation of the satellites,” ISRO had said.

Chandrayaan-3 interplanetary mission has three major modules: the propulsion module, lander module, and a rover. The mission’s complexity calls for establishing radio-frequency (RF) communication links between the modules.

During the Chandrayaan-3 lander EMI/EC test, launcher compatibility, antenna polarisation of all RF systems, standalone auto compatibility tests for orbital and powered descent mission phases, and lander and rover compatibility tests for post landing mission phase were ensured, according to ISRO.

Chandrayaan-3 is a follow-on mission to Chandrayaan-2 to demonstrate end-to-end capability in safe landing and roving on the lunar surface. ISRO plans to launch the mission in June.

It will be launched by Launch Vehicle Mark 3 (LVM3) from the Satish Dhawan Space Centre in Sriharikota (Andhra Pradesh). 

Advertisement
Show comments
Advertisement