Add Tribune As Your Trusted Source
TrendingVideosIndia
Opinions | CommentEditorialsThe MiddleLetters to the EditorReflections
UPSC | Exam ScheduleExam Mentor
State | Himachal PradeshPunjabJammu & KashmirHaryanaChhattisgarhMadhya PradeshRajasthanUttarakhandUttar Pradesh
City | ChandigarhAmritsarJalandharLudhianaDelhiPatialaBathindaShaharnama
World | ChinaUnited StatesPakistan
Diaspora
Features | The Tribune ScienceTime CapsuleSpectrumIn-DepthTravelFood
Business | My Money
News Columns | Straight DriveCanada CallingLondon LetterKashmir AngleJammu JournalInside the CapitalHimachal CallingHill ViewBenchmark
Don't Miss
Advertisement

Nuclear cooperation with Russia continues for Kudankulam power plant

Unlock Exclusive Insights with The Tribune Premium

Take your experience further with Premium access. Thought-provoking Opinions, Expert Analysis, In-depth Insights and other Member Only Benefits
Yearly Premium ₹999 ₹349/Year
Yearly Premium $49 $24.99/Year
Advertisement

New Delhi, September 5

Advertisement

Despite western sanctions on Russia, nuclear cooperation is going ahead. Atommash, a subsidiary of Russian nuclear energy giant Rusatom, has completed a milestone in manufacturing the steam generator for the fifth unit of the Kudankulam nuclear power plant.

Advertisement

Preliminary, support components and 11,000 heat-exchange coils were completed inside the steam generator. Specialists will now perform local heat treatment of welds and a full range of technical inspections, including hydraulic tests and eddy-current test of heat-exchange tubes.

The steam generator is a heat exchange equipment, part of the reactor facility and belongs to the first safety class items.

The Kudankulam nuclear power plant with VVER-1000 power units is located in Tamil Nadu.

Advertisement

Since February 2016, the first power unit of the Kudankulam NPP has been steadily operating at the design power level of 1,000 MW.

The second power unit was connected to India’s national power grid on August 29, 2016.

The Master Framework Agreement with Rosatom on the construction of the third and fourth units was signed 2014.

In 2017, Rosatom State Corporation and the Nuclear Power Corporation of India signed an agreement for the construction of the third stage (power unit’s No. 5 and No. 6) of the Kudankulam NPP.

Advertisement
Show comments
Advertisement