DT
PT
Subscribe To Print Edition About The Tribune Code Of Ethics Download App Advertise with us Classifieds
search-icon-img
search-icon-img
Advertisement

GHTP gets new chief engineer

  • fb
  • twitter
  • whatsapp
  • whatsapp
Advertisement

Tribune News Service

Advertisement

Bathinda, May 3

Advertisement

Punjab State Power Corporation Limited has handed over the command of its Guru Hargobind Thermal Plant, Lehra Mohabbat, to Lakhwinder Singh, who upon his elevation as Chief Engineer/ Operation & Maintenance, has been posted at this plant. The former chief engineer of the plant, Kuldeep Garg, has been given the charge of Guru Nanak Dev Thermal Plant, Bathinda.

Lakhwinder Singh has earlier served at various positions at Guru Gobind Singh Super Thermal Plant, Ropar, before being posted at GHTP, Lehra Mohabbat. It is worth mentioning here that in 1998 when the 210 megawatt units of GHTP were being commissioned, he was especially brought from GGSSTP, Ropar, to this plant as an expert of Control & Instrumentation.

Advertisement

Advertisement
Advertisement
Advertisement
tlbr_img1 Classifieds tlbr_img2 Videos tlbr_img3 Premium tlbr_img4 E-Paper tlbr_img5 Shorts