DT
PT
Subscribe To Print Edition About The Tribune Code Of Ethics Download App Advertise with us Classifieds
search-icon-img
search-icon-img
Advertisement

Bandipora-Gurez road reopened for traffic

  • fb
  • twitter
  • whatsapp
  • whatsapp
Advertisement

Tribune News Service

Advertisement

Srinagar, April 25

Advertisement

The 86-km-long Bandipora-Gurez road was thrown open for traffic after remaining closed due to heavy snowfall at Razdan pass.

The road was thrown open by Maj Gen CP Ponnappa, General Officer Commanding (GOC), 28 Infantry Division, in the presence of the Chief Engineer, Project Beacon, and the Deputy Commissioner, Bandipora.

Advertisement

Maj General Ponnapa said the highway had remained open for an extended period last year due to the efforts of the BRO personnel. The GOC said over 32,000 people of Gurez get affected as the entire area remains cut off from the rest of the country during winter.

“This season, the work on snow clearance on the Bandipora-Gurez road commenced much earlier, resulting in its early opening,” the GOC said.

Advertisement
Advertisement
Advertisement
Advertisement
tlbr_img1 Classifieds tlbr_img2 Videos tlbr_img3 Premium tlbr_img4 E-Paper tlbr_img5 Shorts