DT
PT
Subscribe To Print Edition About The Tribune Code Of Ethics Download App Advertise with us Classifieds
search-icon-img
search-icon-img
Advertisement

Geothermal project to come up in Ladakh

LEH: A 500 KV geothermal pilot project at Puga hot water springs in Leh district of the Ladakh Union Territory would come up by November end next year
  • fb
  • twitter
  • whatsapp
  • whatsapp
Advertisement

Our Correspondent

Advertisement

Leh, November 15

Advertisement

A 500 KV geothermal pilot project at Puga hot water springs in Leh district of the Ladakh Union Territory would come up by November end next year.

Nawang Thinless Lonpo, coordinator of the project said Puga hot water springs alone has a potential of generating 80 MW of geothermal energy.

Advertisement

He added that engineers from the Oil and Natural Gas Corporation comprising Peeyush Kumar, Uday Shankar and Ahsan Absar ex-Director, Geological Survey of India, visited Puga hot water springs on Thursday.

The team met and discussed the proposed plan with Lieutenant-Governor RK Mathur and Adviser Umang Narula.

The engineers also held a meeting with Gyal P Wangyal, chief executive councillor, LAHDC, and discussed about exploration of geothermal energy from Puga Changthang. The engineers apprised Wangyal that the Government of India has asked the Oil and Natural Gas Corporation to harness geothermal energy from Puga and other potential areas in the Union Territory

Wangyal said Puga geothermal energy project has an immense potential and it would be a game changer for the Union Territory of Ladakh in the long run.

Advertisement
Advertisement
Advertisement
Advertisement
tlbr_img1 Home tlbr_img2 Classifieds tlbr_img3 Premium tlbr_img4 Videos tlbr_img5 E-Paper