DT
PT
Subscribe To Print Edition About The Tribune Code Of Ethics Download App Advertise with us Classifieds
search-icon-img
search-icon-img
Advertisement

‘Major construction in Ram temple to be finished by July-end’

  • fb
  • twitter
  • whatsapp
  • whatsapp
featured-img featured-img
The Ram Temple in Ayodhya. File
Advertisement

The construction of the Ram temple here is in its final phase, with all major work expected to be completed by the end of July, Chairman of the Ram Temple Construction Committee Nripendra Mishra said on Saturday. He said of the 14 lakh cubic feet of Bansi Paharpur stone required for the temple and its enclosure, 13 lakh cubic feet had already been installed. “For the first time in India, titanium, which has a durabilityof 1,000 years, is being used in the windows of a temple,” he said.

Advertisement

Advertisement
Advertisement
Advertisement
Advertisement
tlbr_img1 Classifieds tlbr_img2 Videos tlbr_img3 Premium tlbr_img4 E-Paper tlbr_img5 Shorts