DT
PT
Subscribe To Print Edition About The Tribune Code Of Ethics Download App Advertise with us Classifieds
search-icon-img
search-icon-img
Advertisement

Minister reviews progress of bridge construction in Patiala

Directed the Mandi Board to ensure completion by the October deadline
  • fb
  • twitter
  • whatsapp
  • whatsapp
featured-img featured-img
Punjab Health Minister Balbir Singh. File
Advertisement

Punjab Health Minister Dr Balbir Singh today conducted an inspection of Daulatpur and Falauli villages to review the progress of bridge construction over the Badi Nadi.

Advertisement

At Daulatpur, he inspected the ongoing bridge project and directed the Mandi Board to ensure completion by the October deadline. He emphasized that the work must be finished on schedule to prevent inconvenience during the monsoon.

Accompanied by Deputy Commissioner Dr Preeti Yadav, Municipal Commissioner Parmvir Singh, the minister also reviewed the condition of a temporary access road.

Advertisement

Later, Singh instructed the Municipal Commissioner to initiate construction of roads in the Focal Point area, ensuring that proper drainage systems are installed to prevent waterlogging. The Commissioner confirmed that tenders have been issued and work will commence shortly.

Advertisement
Advertisement
Advertisement
Advertisement
tlbr_img1 Classifieds tlbr_img2 Videos tlbr_img3 Premium tlbr_img4 E-Paper tlbr_img5 Shorts