DT
PT
Subscribe To Print Edition About The Tribune Code Of Ethics Download App Advertise with us Classifieds
search-icon-img
search-icon-img
Advertisement

Chandigarh Chief Engineer raps officials over waterlogging, bad-road conditions in Sector 35

Inspects areas along with area councillor, finds stagnation of water and broken roads
  • fb
  • twitter
  • whatsapp
  • whatsapp
featured-img featured-img
During the inspection, the roads in the sector were found to be in a dilapidated condition and require immediate repair/patchwork. Tribune photo
Advertisement

Chief Engineer of Municipal Corporation Sanjay Arora has criticised officers of the Engineering Department over the water logging in Sector 35, Chandigarh.

Advertisement

Arora, along with Area Councillor Prem Lata and officials from the Road Wing, Horticulture Wing, Public Health Wing, and staff of MOH, inspected the area of Sector 35-B this morning after receiving complaints of water logging and broken roads.

During the inspection, the roads in the sector were found to be in a dilapidated condition and require immediate repair/patchwork.

Advertisement

It was informed by the officers that technical sanction for the road work has already been accorded and tendering will be initiated within a week.

Directions were issued to ensure the timely floating of the tender. Water stagnation was observed, particularly leading to the ingress of storm water into the BBMB Guest House and a nearby Mandir during the current monsoon season.

Advertisement

The officials were directed to execute the provision of additional road gullies and strengthening measures at the earliest to ensure the free flow of stormwater.

A Sahaj Safai Kendra (SSK) was found abandoned in the area.

The Chief Engineer directed that it be put to use for horticulture purposes, specifically for shredding horticulture waste before onward transportation to the processing site. It was also directed that the Road Wing ensure immediate patchwork and timely processing of tenders.

The Public Health Wing was instructed to expedite the splitting of storm water works and the execution of additional drainage arrangements on top priority. The Horticulture Wing was tasked with taking charge of the SSK and operationalizing it for horticulture waste management, and the MOH staff was instructed to coordinate with concerned wings for effective monitoring and compliance.

Advertisement
Advertisement
Advertisement
tlbr_img1 Classifieds tlbr_img2 Videos tlbr_img3 Premium tlbr_img4 E-Paper tlbr_img5 Shorts