DT
PT
Subscribe To Print Edition About The Tribune Code Of Ethics Download App Advertise with us Classifieds
search-icon-img
search-icon-img
Advertisement

Chandigarh’s Dakshin Marg partly closed till June 8

UT Engineering Department is set to begin road repair work
  • fb
  • twitter
  • whatsapp
  • whatsapp
featured-img featured-img
Dakshin Marg. Tribune file photo
Advertisement

The UT Administration has decided to close one side of the Dakshin Marg for seven days.

Advertisement

According to officials, the Dakshin Marg road between Sector 25 and Sector 25 (W) will remain closed till June 8 due to road repair work that will be carried out by the UT Engineering Department.

Earlier, the stretch between Sectors 25 and 38 (towards Sector 38 side) was closed from May 11 to 20 for repair work.

Advertisement

Advertisement
Advertisement
Advertisement
Advertisement
tlbr_img1 Classifieds tlbr_img2 Videos tlbr_img3 Premium tlbr_img4 E-Paper tlbr_img5 Shorts