DT
PT
Subscribe To Print Edition About The Tribune Code Of Ethics Download App Advertise with us Classifieds
search-icon-img
search-icon-img
Advertisement

MLA lays foundation stones of ROB, RUB at Mandi Gobindgarh

  • fb
  • twitter
  • whatsapp
  • whatsapp
Advertisement

Our Correspondent

Advertisement

Fatehgarh Sahib, January 8

Advertisement

The state government is committed to the overall development of Punjab. All projects are initiated as per demands of the people. This was stated by the Amloh MLA, Kaka Randeep Singh Nabha, while addressing the gathering after laying the foundation stones of the railway overbridge (ROB) 151-C and railway underbridge (RUB) to be constructed at the cost of Rs42 crore at Mandi Gobindgarh today.

This project would fulfil decades old demand of the people and would be completed in a year, he added. The length of the ROB would be 790 metres and the carriageway would be 9.5 metres, he said. The length of RUB, meant for light traffic, would be 320 metres, he added.

Advertisement

The MLA also laid foundation stone of other development projects to be constructed at the cost of Rs10 crore.

District planning committee chairman Harinder Singh Bhambri, MLA Randeep Singh’s wife Beheshta Singh, Amloh SDM Anand Sagar Sharma, DCC president Subhash Sood and PWD executive engineer Balwinder Singh also addressed the gathering.

Advertisement
Advertisement
Advertisement
tlbr_img1 Classifieds tlbr_img2 Videos tlbr_img3 Premium tlbr_img4 E-Paper tlbr_img5 Shorts