Dharam Pal said the Engineering Department told him that the manhole slab was broken due to the movement of a truck. The new slab was laid today and manhole frame had been grouted in it. The manhole cover was now safely at the site office, he said. The same shall be fixed after slab setting.
Unlock Exclusive Insights with The Tribune Premium
Take your experience further with Premium access.
Thought-provoking Opinions, Expert Analysis, In-depth Insights and other Member Only Benefits
Already a Member? Sign In Now