DT
PT
Subscribe To Print Edition About The Tribune Code Of Ethics Download App Advertise with us Classifieds
search-icon-img
search-icon-img
Advertisement

Repair of all roads in state by June 15: Gangwa

Says signboards must be displayed at construction sites
  • fb
  • twitter
  • whatsapp
  • whatsapp
featured-img featured-img
Public Works Minister Ranbir Gangwa. File photo
Advertisement

Haryana Public Health Engineering and Public Works Minister Ranbir Gangwa has said the repair of roads and filling of potholes across the state will be completed by June 15.

Advertisement

Presiding over a meeting with Superintending Engineers (SEs), Executive Engineers (XENs), Sub-Divisional Officers (SDOs), and Junior Engineers (JEs) on Tuesday, he said the XENs and JEs had been directed not to take leave, so that development works were not disrupted.

Interacting with the media, he said the primary objective of the meeting was to ensure that there was no negligence in the repair and construction of roads.

Advertisement

Of 30,000 km roads in the state, 14,000 km were currently under the Defect Liability Period (DLP), and their patchwork must be completed by June 15. The repair work of 5,500 km roads, which was currently underway, was targeted for completion by July 31, he said.

He further said signboards must be displayed at construction sites, and an information board should be installed mentioning the names and mobile numbers of the XEN, SDO, JE, and contractor concerned, so that the public could contact them, if needed.

Advertisement

He also said the complaints received on HARPATH app must be resolved within the stipulated time. In case of a complaint related to the PWD, residents could submit it on 9999001316 via WhatsApp, said Gangwa.

Advertisement
Advertisement
Advertisement
Advertisement
tlbr_img1 Classifieds tlbr_img2 Videos tlbr_img3 Premium tlbr_img4 E-Paper tlbr_img5 Shorts