DT
PT
Subscribe To Print Edition About The Tribune Code Of Ethics Download App Advertise with us Classifieds
search-icon-img
search-icon-img
Advertisement

Both portals of Manali NH tunnel connected

  • fb
  • twitter
  • whatsapp
  • whatsapp
Advertisement

Mandi, June 26

Advertisement

The construction company Afcons connected both portals of the 1.8-km-long tunnel on the Chandigarh-Manali highway today. This tunnel was constructed under a mighty mountain between Rainsnala to Dwada in Mandi.

Sources said during the excavation, the company faced challenges because the strata was loose. It took more than a year to connect both portals of the tunnel.

Advertisement

The Chandigarh-Manali fourlane is the lifeline for the tourism industry of Kullu-Manali. During the summer, it is used by the Army to provide essential supplies to its soldiers deployed in border areas in the Ladakh region.

Aman Rohila, project director of the NHAI, said it was a major achievement for the NHAI that the both portals had been connected and the NHAI had stepped up construction work of fourlaning. — TNS

Advertisement

Advertisement
Advertisement
Advertisement
Advertisement
tlbr_img1 Classifieds tlbr_img2 Videos tlbr_img3 Premium tlbr_img4 E-Paper tlbr_img5 Shorts