TrendingVideosIndia
Opinions | CommentEditorialsThe MiddleLetters to the EditorReflections
UPSC | Exam ScheduleExam Mentor
State | Himachal PradeshPunjabJammu & KashmirHaryanaChhattisgarhMadhya PradeshRajasthanUttarakhandUttar Pradesh
City | ChandigarhAmritsarJalandharLudhianaDelhiPatialaBathindaShaharnama
World | ChinaUnited StatesPakistan
Diaspora
Features | The Tribune ScienceTime CapsuleSpectrumIn-DepthTravelFood
Business | My MoneyAutoZone
News Columns | Straight DriveCanada CallingLondon LetterKashmir AngleJammu JournalInside the CapitalHimachal CallingHill View
Don't Miss
Advertisement

Kullu-Manali NH opened for traffic

Vehicle crosses through the partially repaired Kullu-Manali NH at Raison in Kullu on Sunday. Tribune photo

Unlock Exclusive Insights with The Tribune Premium

Take your experience further with Premium access. Thought-provoking Opinions, Expert Analysis, In-depth Insights and other Member Only Benefits
Yearly Premium ₹999 ₹349/Year
Yearly Premium $49 $24.99/Year
Advertisement

Our Correspondent

Advertisement

Kullu, August 4
The Kullu-Manali National Highway (NH 3) was restored on Sunday evening after the patches of the road washed away due to the flood in Beas on July 31 at Raison and Bindu Dhek near 18 Mile were partially repaired and thrown open for all types of vehicles. The work of the restoration of the highway was started by the National Highways Authority of India (NHAI) on Friday restoring the NH within two days.
About 100 metres of patch was restored in Raison which was badly damaged. The same spot was damaged in the floods in July last year as well. The patch of about 20 metres in Bindu Dhek was also repaired and thrown open to traffic from today. The residents heaved a sigh of relief as the NHAI has been able to restore the road in a record time.
A resident of Katrain village, Saurabh said, “Everybody had an apprehension that it would take a long time to restore connectivity through Raison but the NHAI has done a remarkable job”. Meanwhile, the traffic was diverted via the Left Bank through Raison bridge.
The black topping of the Raison patch damaged last year was also completed recently in March. This year the damages suffered by the NH have been comparatively less than last year so far. This year while two spots suffered major damage, last year about 12 spots on the NH having a cumulative length of 3,200 meters had suffered massive damages.

Advertisement

Advertisement
Show comments
Advertisement