DT
PT
Subscribe To Print Edition About The Tribune Code Of Ethics Download App Advertise with us Classifieds
search-icon-img
search-icon-img
Advertisement

Landslides leave Nurpur thirsty

  • fb
  • twitter
  • whatsapp
  • whatsapp
featured-img featured-img
Field employees of the Jal Shakti Department, Nurpur, repair main water supply lines near Housing Board Colony on Wednesday.
Advertisement

Nurpur town, already reeling under three days of power outages, now finds itself gasping for relief as piped water supply remains disrupted for the third consecutive day. The breakdown of the Chakki Water Supply Scheme, the main lifeline for most households, has left residents in deep distress.

Advertisement

Despite the existence of three supply schemes, Chakki caters to the largest part of Nurpur, making its collapse a civic crisis. The disruption stems from landslides near the Housing Board Colony in Ward No. 2, where the main overhead tank of the Jal Shakti Department (JSD) is located. Massive debris has damaged both the pipelines and the power lines essential to the system.

The havoc hasn’t spared electricity either. Five poles of the 11 kV feeder from Sulilali subdivision were swallowed by the sliding earth near Nakki. Without power, the water scheme stands crippled.

Advertisement

JSD Executive Engineer Anand Baloria assured that “damaged pipelines are being repaired and water supply is expected to be restored by tonight,” while Vikas Thakur, Executive Engineer of the electrical division, confirmed that repair work on power lines will be initiated on Thursday evening.

Meanwhile, frustrated residents, including Pavnesh Gupta, Vivek, Praveen Sangalia, Udhit Gandhi and Hanumati, urged both JSD and HPSEB to recognise the urgency of restoring services for an urban population wholly dependent on piped supply

Advertisement

Advertisement
Advertisement
Advertisement
tlbr_img1 Classifieds tlbr_img2 Videos tlbr_img3 Premium tlbr_img4 E-Paper tlbr_img5 Shorts