DT
PT
Subscribe To Print Edition About The Tribune Code Of Ethics Download App Advertise with us Classifieds
search-icon-img
search-icon-img
Advertisement

Work begins to clear snow from Manali highway

With winters receding in mountainous regions, the Border Roads Organisation (BRO) has commenced work to clear snow along the strategic Manali-Leh highway. The road, which connects Ladakh with the rest of India, remains closed for several months in winter due...
  • fb
  • twitter
  • whatsapp
  • whatsapp
featured-img featured-img
BRO machines clear snow along the Manali-Leh highway. Tribune photo
Advertisement

With winters receding in mountainous regions, the Border Roads Organisation (BRO) has commenced work to clear snow along the strategic Manali-Leh highway.

Advertisement

The road, which connects Ladakh with the rest of India, remains closed for several months in winter due to heavy snow in higher reaches. The operations are being undertaken under BRO’s Project Himank, which is responsible for road construction and their maintenance in southern Ladakh.

“The operation aims to restore connectivity along the strategic highway, which serves as a lifeline for both civilians and defence personnel operating in the region,” BRO sources said.

Advertisement

The ongoing operation is being carried out in extreme weather conditions, with teams of skilled personnel and heavy machinery deployed to clear massive snow accumulations along key stretches of the highway.

The 427-km Manali-Leh route is part of National Highway-03 and is vital for transport and logistics, especially for the armed forces stationed in the high-altitude areas of Ladakh.

Advertisement

Advertisement
Advertisement
Advertisement
Advertisement
tlbr_img1 Home tlbr_img2 Classifieds tlbr_img3 Premium tlbr_img4 Videos tlbr_img5 E-Paper