DT
PT
Subscribe To Print Edition About The Tribune Code Of Ethics Download App Advertise with us Classifieds
search-icon-img
search-icon-img
Advertisement

Anji Khad rail bridge nears completion

A trial run of a tower wagon was conducted on the India’s first cable-stayed railway bridge at Anji Khad. It will connect Katra and Reasi section of the Udhampur-Srinagar-Baramulla-Rail-Link (USBRL). Union Minister for Railways Ashwini Vaishnaw posted on X: “Trial...
  • fb
  • twitter
  • whatsapp
  • whatsapp
featured-img featured-img
The cable-stayed railway bridge at Anji Khad in Reasi. File
Advertisement

A trial run of a tower wagon was conducted on the India’s first cable-stayed railway bridge at Anji Khad. It will connect Katra and Reasi section of the Udhampur-Srinagar-Baramulla-Rail-Link (USBRL).

Union Minister for Railways Ashwini Vaishnaw posted on X: “Trial run of tower wagon on India’s First Cable-Stayed Railway Bridge at Anji Khad for USBRL Project in J&K”.

After completion, trains from across the country will have a direct access to the Kashmir valley. This is expected to further boost tourism of the region throughout the year. Inspection of the Katra-Reasi section by the Commission for Railway Safety’s (CRS) is also likely to be held in the first week of January. The CRS is the last step before the Railways can plan the operation of trains on the route.

Advertisement

General Manager of Northern Railways Ashok Kumar, who visited Anantnag last week, had said the final assessments to commence train services were underway.

Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
tlbr_img1 Home tlbr_img2 Opinion tlbr_img3 Classifieds tlbr_img4 Videos tlbr_img5 E-Paper