DT
PT
Subscribe To Print Edition About The Tribune Code Of Ethics Download App Advertise with us Classifieds
Add Tribune As Your Trusted Source
search-icon-img
search-icon-img
Advertisement

Remove bottlenecks in transmission: Divisional Commissioner to Power Dept

  • fb
  • twitter
  • whatsapp
  • whatsapp
Advertisement
Advertisement

Jammu, July 25

Advertisement

Jammu Divisional Commissioner Ramesh Kumar reviewed the status of power supply in the districts of Jammu division.

Advertisement

MD Jammu Power Distribution Corporation Limited (JPDCL), Deputy Commissioners of the districts of Jammu division, Chief Engineer JPDCL, Chief Engineer JPTCL and sectoral and district officials concerned of Power Development Department (PDD) were present.

The Divisional Commissioner directed the officials of PDD to ensure better power supply to all regions, especially in 100 per cent smart-metered areas. He told officials to ensure minimum response time in repair and replacement of damaged transformers. Directing the officials of the Power Department to minimise power curtailments, Ramesh Kumar asked them to remove the bottlenecks in transmission and distribution network, if any.

Advertisement

The Divisional Commissioner took appraisal of the supply situation in all districts of the region from the DCs who apprised him on the power supply, curtailments schedules and response time in their respective districts.

Advertisement
Advertisement
Advertisement
tlbr_img1 Classifieds tlbr_img2 Videos tlbr_img3 Premium tlbr_img4 E-Paper tlbr_img5 Shorts