Vaishno Devi shrine board to construct skywalk by November : The Tribune India

Join Whatsapp Channel

Vaishno Devi shrine board to construct skywalk by November

Vaishno Devi shrine board to construct skywalk by November

The Vaishno Devi shrine will soon have a skywalk near the bhawan (temple) area that would provide separate paths for incoming and outgoing pilgrims. It will be 20 feet above the track level.



Our Correspondent

Jammu, August 28

The Vaishno Devi shrine will soon have a skywalk near the bhawan (temple) area that would provide separate paths for incoming and outgoing pilgrims. It will be 20 feet above the track level.

While the present route will be used to reach the shrine, the skywalk, an elevated route, will provide exit from the temple area or vice versa. The length of the skywalk will be nearly 200 metres and its width will be 2.5 metres.

Conceptualised with an emphasis on safety and facility, the skywalk will have seating arrangements for senior citizens and women. In addition, two waiting halls with washroom facilities are being constructed along the skywalk to ensure seating arrangement for around 150 devotees.

After introducing the radio frequency identity cards (RFID) to keep a track on the movement of pilgrims, the Shri Mata Vaishno Devi Shrine Board (SMVDSB) has started work on the much-needed skywalk.

Costing over Rs 9.89 crore, the workis expected to be completed by November, an official of the SMVDSB said.

He said the facility, 20 feet above the track level, would help overcome the problem of multidirectional flow of yatra and a chaotic condition between Manokamna Bhawan and gate number 3, the scene of stampede on New Year’s Day in which 12 people lost their lives and 16 others were injured.

It was the first such tragedy at the shrine, where pilgrims reach after a 13-km trek from the base camp of Katra, following which Lieutenant Governor Manoj Sinha, who is also the chairperson of the SMVDSB, had announced several decisions to ensure the safety of the devotees, including a provision for 100% online registration.

Sinha had issued directions for physical and systematic improvements wherever required after critical examination. (With PTI inputs)

Rs 9.89 crore project for crowd mgmt

  • The Rs 9.89 crore project will ensure better crowd management. After the stampede claimed 12 lives in January, L-G Manoj Sinha announced several decisions to ensure devotees’ safety.

#jammu #vaishno devi


Top News

Country believes new journey into future will begin from 2024 General Election: PM Modi

Country believes new journey into future will begin from 2024 General Election: PM Modi

PM was addressing gathering at 2,550th Bhagwan Mahaveer Nirv...

ED arrests retired Chhattisgarh IAS officer Anil Tuteja in liquor ‘scam’ case

ED arrests retired Chhattisgarh IAS officer Anil Tuteja in liquor ‘scam’ case

The Central agency had detained 2003 batch officer Tuteja in...

Massive fire breaks out at two factories in Himachal Pradesh’s Baddi, loss worth lakhs reported

Massive fire breaks out at two factories in Himachal Pradesh’s Baddi; loss worth lakhs reported

No casualty reported in the incident, cause of fire yet to b...

9 returning from wedding ceremony killed as car, truck collide head-on in Rajasthan’s Jhalawar

9 returning from wedding ceremony killed as car, truck collide head-on in Rajasthan’s Jhalawar

The mishap occurred near Eklera village when deceased were r...

Hubballi murder: Accused's father apologises to victim Neha's family, demands punishment for son

Hubballi murder: Accused's father apologises to victim Neha's family, demands punishment for son

Victim's family has been demanding that the accused be hange...


Cities

View All