DT
PT
Subscribe To Print Edition About The Tribune Code Of Ethics Download App Advertise with us Classifieds
search-icon-img
search-icon-img
Advertisement

New projects along with repair of flood-damaged roads: MP

  • fb
  • twitter
  • whatsapp
  • whatsapp
Advertisement

Laying the foundation stone for the construction of Mukandpur-Chakdana road here on Sunday, Member of Parliament Malvinder Singh Kang said that the 9.62 km link road would be constructed at a cost of Rs 4.30 crore.

Advertisement

Accompanied by MLA Dr Sukhwinder Kumar Sukhi, MP Malvinder Singh Kang stated that the construction of this link road would be done shortly. He said this major connectivity to Phillaur and other destinations for the nearby villages was being rejuvenated, thus ensuring smooth travel between Banga and Phillaur. He said the vital link road would further strengthen rural connectivity.

The MP pointed out that along with repairing flood-damaged roads, new road projects were being executed to improve road infrastructure across the state. He also directed the officials concerned to strictly ensure quality and timeline.

Advertisement

MLA Dr Sukhi said the state government would build or strengthen road network where required in the assembly segment as well as upgrade the roads. Maintenance would also be ensured for the next five years, he said.

Advertisement
Advertisement
Advertisement
Advertisement
tlbr_img1 Classifieds tlbr_img2 Videos tlbr_img3 Premium tlbr_img4 E-Paper tlbr_img5 Shorts