DT
PT
Subscribe To Print Edition About The Tribune Code Of Ethics Download App Advertise with us Classifieds
search-icon-img
search-icon-img
Advertisement

Modi inaugurates first-ever optical fibre cable project for Andaman and Nicobar Islands

High-speed broadband connections in the union territory at par with services in the mainland.
  • fb
  • twitter
  • whatsapp
  • whatsapp
Advertisement

New Delhi, August 10

Prime Minister Narendra Modi on Monday inaugurated the first-ever undersea optical fibre project for Andaman and Nicobar Islands which will provide high-speed broadband connections in the Union Territory at par with services in the mainland.

high-speed broadband connections in the union territory at par with services in the mainland.

Advertisement

On December 30, 2018, the Prime Minister had laid the foundation for the 2,312-Kilometers long submarine optical fibre cable project connecting Chennai – Andaman and Nicobar Islands (CANI).

“From Chennai to Port Blair, Port Blair to Little Andaman and Port Blair to Swaraj Dweep, this service has started in large part of Andaman Nicobar from today,” Modi said after inaugurating the project.

Advertisement

The project has been implemented at a cost of Rs 1,224 crore.

Besides, Port Blair, it will connect other islands namely Swaraj Dweep (Havlock), Long Island, Rangat, Little Andaman, Kamorta, Car Nicobar and Greater Nicobar.

PM said that it is the responsibility of the nation to provide modern telecom connectivity to the people of Andaman and Nicobar Islands.

All telecom operators in the country will be able to provide their mobile and broadband services using the CANI optical fibre link.

“The optical fibre connectivity project to connect Andaman and Nicobar with the rest of the country and the world is a symbol of our commitment towards ease of living,” Modi said.

According to official data, internet with a speed of 400 gigabytes (Gb) per second will be provided at Port Blair and for other islands, it will be 200 Gb per second.

Undersea cable linking the Andaman Islands with Chennai was laid before time, Modi said while inaugurating the cable link.

Work of laying undersea cable has been executed by BSNL in a record time of less than 24 months.

This project will give a boost to 4G mobile services and digital services like tele-education, telehealth, e-governance services and tourism on the islands. PTI

Advertisement
Advertisement
Advertisement
Advertisement
tlbr_img1 Home tlbr_img2 Opinion tlbr_img3 Classifieds tlbr_img4 Videos tlbr_img5 E-Paper