DT
PT
Subscribe To Print Edition About The Tribune Code Of Ethics Download App Advertise with us Classifieds
search-icon-img
search-icon-img
Advertisement

Patiala DC reviews road repair work

Yadav assessed the pipeline laying status along key stretches
  • fb
  • twitter
  • whatsapp
  • whatsapp
featured-img featured-img
Photo for representational purpose only. - iStock File photo
Advertisement

Deputy Commissioner Preeti Yadav has reviewed the repair work of roads, which have been dug up for laying canal-based water supply pipeline in Patiala.

Advertisement

She directed officials of the Public Works Department and Patiala Municipal Corporation to float tenders and begin repair work as soon as the Water Supply and Sewerage Board issues the completion certificate.

Yadav assessed the pipeline laying status along key stretches including Gurdwara Dukh Niwaran Sahib Chowk, Jail Road, Tripari Turn, Sirhind Road to Khanda Chowk, Khanda Chowk to Lehal Chowk, Leela Bhawan Chowk to Fuhara Chowk and onwards to Kali Devi Mandir.

Advertisement

She emphasised that while repairing roads and intersections, adequate drainage must be ensured to prevent waterlogging.

Besides, illegal encroachments must be removed and road widths must be maintained, she added.

Advertisement

The Deputy Commissioner issued instructions to complete all work near Gurdwara Dukh Niwaran Sahib before the 350th Martyrdom Day of Sri Guru Tegh Bahadur in November, ensuring smooth movement of devotees, who will come here to attend the celebrations.

She warned that any laxity, such as incomplete drainage or continued encroachments, will invite action against the responsible agencies and officers.

Yadav also stated that she will personally monitor progress on the site.

Advertisement
Advertisement
Advertisement
tlbr_img1 Classifieds tlbr_img2 Videos tlbr_img3 Premium tlbr_img4 E-Paper tlbr_img5 Shorts