DT
PT
Subscribe To Print Edition About The Tribune Code Of Ethics Download App Advertise with us Classifieds
search-icon-img
search-icon-img
Advertisement

Part of Sutlej bank washed away near Harike headworks

The Sutlej is overflowing for the past three days, inundating vast swathes of land
  • fb
  • twitter
  • whatsapp
  • whatsapp
featured-img featured-img
Representational photo
Advertisement

A portion of a solid structure built into the riverbank to prevent erosion was washed away near the Harike headworks on Thursday, prompting the authorities to launch immediate repairs with the Sutlej water flowing above the danger mark in the area.

Advertisement

Irrigation Department XEN Sahil said their staff and local villagers were working together to strengthen the riverbank.

The Sutlej is overflowing for the past three days, inundating vast swathes of land here. Deputy Commissioner Rahul said 2.62 lakh cusecs of water was being discharged from the headworks after the water level crossed the danger mark.

Advertisement

Advertisement
Advertisement
Advertisement
tlbr_img1 Classifieds tlbr_img2 Videos tlbr_img3 Premium tlbr_img4 E-Paper tlbr_img5 Shorts