Ludhiana MC to install storm sewer system near Clock Tower : The Tribune India

Join Whatsapp Channel

Ludhiana MC to install storm sewer system near Clock Tower

Will solve issue of watelogging in the Old GT Road area during the rainy season

Ludhiana MC to install storm sewer system near Clock Tower

Water accumulated on a road after rain near Clock Tower in Ludhiana. file



Harshraj Singh

Tribune News Service

Ludhiana, December 28

Finally, the Municipal Corporation (MC) is going to install storm sewer system to address over a decade old waterlogging problem near the iconic Clock Tower in the city.

Whenever it rains heavily, commuters as well as shopkeepers have to wade through knee deep water accumulated at this prominent location on the Old GT Road in the city.

Notably, the Finance and Contract Committee of the MC has given its nod for installation of the storm sewer system on a stretch near Clock Tower. The storm sewer line is supposed to be connected with an old drain passing through near Bhadaur House Market.

As per the information, an old sewer line (to drain out rainwater) had earlier got damaged when pillars of the Elevated Road were constructed on the Old GT Road. Shopkeepers of markets near Clock Tower had been complaining about massive waterlogging, especially during the rainy season, for a long time.

According to some shopkeepers, since the Elevated Road was constructed, waterlogging became a serious problem at Guru Teg Bahadur Sahib Market and Old GT Road stretch near the Clock Tower. Many times, rainwater entered shops in the area. Major waterlogging was witnessed in this area during rainy season this year leaving people to suffer.

The councillors of the ward concerned have taken up the waterlogging issue with the MC authorities multiple times. The MC executive engineer, Pardeep Saluja, said, “Tenders have been floated for the project. The work to install the storm sewer system near Clock Tower will be completed before the arrival of rainy season next year.”

“The rainwater will get drain through the storm sewer line, which will be connected with a drain passing near Bhadaur House Market. Once the storm sewer line is installed, there will be no waterlogging near the Clock Tower area. The estimated cost of the project is around Rs35 lakh,” he added.


Top News

Lok Sabha election 2024: Voting under way in 88 constituencies; Rahul Gandhi, Hema Malini in fray

Over 63 per cent turnout in Phase 2 of Lok Sabha polls; Tripura records 79.46 per cent, Manipur 77.32 Over 63 per cent turnout in Phase 2 of Lok Sabha polls; Tripura records 79.46 per cent, Manipur 77.32

The Election Commission says polling remained largely peacef...

Arvind Kejriwal as CM even after arrest puts political interest over national interest: Delhi High Court

Arvind Kejriwal as CM even after arrest puts political interest over national interest: Delhi High Court

The court says the Delhi government is ‘interested in approp...

Amritpal Singh to contest Lok Sabha poll from Punjab’s Khadoor Sahib, confirms mother

Amritpal Singh to contest Lok Sabha poll from Punjab’s Khadoor Sahib, confirms mother

The formal announcement is made by his mother Balwinder Kaur...

Supreme Court to deliver verdict on PILs seeking 100 per cent cross-verification of EVM votes with VVPAT today

Supreme Court dismisses PILs seeking 100% cross-verification of EVM votes with VVPAT slips

Bench however, issues certain directions to Election Commiss...

Will stop functioning in India if made to break encryption of messages: WhatsApp to Delhi High Court

Will stop functioning in India if made to break encryption of messages: WhatsApp to Delhi High Court

Facebook and Whatsapp have recently challenged the new rules...


Cities

View All